Neal Anderson

Popular

Building cars

4 Scratch Build Cars Click on any photo to enlarge the photo 1. Flat Car 40′ HO Scale I started with a old sign that was thrown away. It was cut into strips  to be able to move it around. Even set up a work table at the railroad, so I can use the LED […]

Winter Work 7.5 Gauge

When you need a project for the winter. Think BIG Checking out the seats on the riding cars made me want to ride instead of sitting on my butt. Made a mock up of a flat car with a seat. Welded the car up.

Found an S curve in the layout

The railroad had a small problem with the two curves making an S curve on the railroad. This happens when the first curve ends and there is a second curve starting in a different direction that is to close to the first curve. The way to get rid of that is to put a straight […]

Recent Posts

Video of the railroad by rail is out

OK, The video is out and it looks great. Many of the people that have seen it and have been very positive. Took three hours of running trains with Morgan and will be editing soon. As time allows us to complete the different video’s you will see them on the web page.

Speed Ballasting Clinic @ MER — October 21, 2016 in Raleigh

I taught a class at the MER Convention this October 21st in Raleigh. The title was “Speed Ballasting & Great Trackwork in Less Time“. Quickly installing track and ballasting that will perform well and look great is something that many modelers struggle with. This class shows how to do both accurately, yet rapidly. In this […]

Winter is coming to Clovis Point

Clovis Point started out as a vacation spot for summer fun. It has now changed to a winter scene because I have winter people and trees. I removed the scenery from the layout and started adding paper to fill the void in the landscape. The Hydrocal was placed over the paper and let to harden […]

Building a Helix

Ever wonder how to find more space to have your layout get bigger with out adding a new room on? I had an open corner in the room and the next thing I know I’m expanding. The reason for the helix was to lower the layout to connect to a staging yard.  I wanted the […]

When you have a tight space to fill

  When I had a crazy idea to move the return end of the layout and pick it up over the original layout and mount it on a different wall. Some called it impractical and crazy to add on. I went with my heart and started right away. This added at least 30 ft to […]

Becker’s Ice House

With a meat packing plant right around the corner from the yard tracks. The railroad needed an ice house to cool down the cars that needed to be load and then repacked with ice to keep the cars cold in transit. The location came into play when the main tracks could no longer use the […]

Adding a Crossing at Al’s Wharf

The only way to get to Al’s wharf was to get on to the main line and run down to the switch for Al’s wharf and enter the lead track. I wanted to keep Howard Yard off the main line to keep the main line open for trains to move straight and not get stuck […]

Ballasting

With all the track that needed to be ballasted I had to find a quicker way to ballast it. I tested many different types of spreaders and the dreaded spoon. I found the answer when I put mustard on my hot dogs. It turns out a condiment bottle holds ballast very well. With a 1/4 […]

Adding a Turnout in Needmore

The track on the right went behind the yard to the track on the right rear and didn’t stop at the yard. To make the railroad have a dual main line a set of switches had to be added. Ballast was pulled up so the track would go straight into the yard. The  switches were […]