Projects

Ever wonder how to find more space to have your layout get bigger with out adding a new room on? I had an open corner in the room and the next thing I know I’m expanding. The reason for the helix was to lower the layout to connect to a staging yard.  I wanted the […]

Read More

  When I had a crazy idea to move the return end of the layout and pick it up over the original layout and mount it on a different wall. Some called it impractical and crazy to add on. I went with my heart and started right away. This added at least 30 ft to […]

Read More

With a meat packing plant right around the corner from the yard tracks. The railroad needed an ice house to cool down the cars that needed to be load and then repacked with ice to keep the cars cold in transit. The location came into play when the main tracks could no longer use the […]

Read More

The only way to get to Al’s wharf was to get on to the main line and run down to the switch for Al’s wharf and enter the lead track. I wanted to keep Howard Yard off the main line to keep the main line open for trains to move straight and not get stuck […]

Read More

With all the track that needed to be ballasted I had to find a quicker way to ballast it. I tested many different types of spreaders and the dreaded spoon. I found the answer when I put mustard on my hot dogs. It turns out a condiment bottle holds ballast very well. With a 1/4 […]

Read More

The track on the right went behind the yard to the track on the right rear and didn’t stop at the yard. To make the railroad have a dual main line a set of switches had to be added. Ballast was pulled up so the track would go straight into the yard. The  switches were […]

Read More