2019 Progress

January

Looking for something to change up the train hobby so I don’t get board.

In comes 7.5 Gauge

    The body of the switcher.

The under frame of the switcher.

Sound boards and motor drives.

Cabs ready for paint.

February

Mounting in the wheels and motors then testing them.

Three ready to assemble. Power test is done.

The bodies are now painted.

March

April

July 2019

Engine ready for evaluation.

NMRA Merit Award 109 out of 125 points.

  Two engines to be evaluated.

NMRA Merit Award on each one. 93 out of 125 points

 First coat of paint.

Up-date on the layout.

Up-date on the MEAD 200