Removal of track
Installing of track
Ballasting of the track
Down goes the ballast
Make up the glue
Spray down the ballast
Glue and dry
Set in place
Alignment
Looks great from overhead
Finished up with ballast
Moving the tracks
Ballasting
Placement of the building
Check alignment